+7 (920) 733-77-33
MODULA HOUSE · Serbia

Modular home and sauna production

The structure, insulation, services and most finishing work are completed in controlled conditions. Work on your plot can then focus on the agreed preparation and installation.

What is included
How a modular building is made
An example from our portfolio
What we agree with you

From your idea to a clear specification

Before work begins, we define the use, materials and scope. Each item is set out in the quote.

01

Preparation before production

Before starting, we confirm the layout, openings, construction layers, equipment and connection points. Later changes can affect cost and timing, so these details are resolved early.

02

Assembly and checks

We assemble the frame, fit insulation and services, close the layers and complete the finishes. Important details are checked before they become concealed.

03

Preparing for transport

We check dimensions, protection, loading sequence and site readiness. Production photographs and video can be shared during the build, with details discussed remotely.

04

Structure and building envelope

The specification covers the load-bearing structure, floor, walls, roof, insulation layers, facade, windows and external doors. Materials and dimensions are confirmed in the selected project’s documentation.

05

Interior and services

We agree floor and wall finishes, internal doors, lighting, electrical work, plumbing and drainage. Heating, cooling, bathroom fittings and kitchen equipment are included only when listed in your quote.

06

Work on your plot

Foundations, transport, unloading, crane hire, installation and external connections are assessed separately. Furniture, terraces and landscaping must also be explicitly listed if included.

Clear before work begins

Design, timing and an agreed price

Foundations, distance, truck access, unloading, crane hire and external connections are assessed separately. A per-kilometre transport price is only a guide; the route and transport requirements are confirmed for each project.

Intended use
Defined by your projectBefore starting, we confirm the layout, openings, construction layers, equipment and connection points. Later changes can affect cost and timing, so these details are resolved early.
Specification
Materials and scope of workWe assemble the frame, fit insulation and services, close the layers and complete the finishes. Important details are checked before they become concealed.
Location
Checked before the contractCheck power, water, drainage and delivery access. Send us the location and photographs so we can assess transport constraints before you settle on building dimensions.
Agreement
Price and schedule in writingBefore signing, you receive the contracting party’s details, payment terms, schedule and responsibilities. Design changes and their impact on cost or timing are confirmed in writing.
How we work

From our first conversation to your keys

The structure, insulation, services and most finishing work are completed in controlled conditions. Work on your plot can then focus on the agreed preparation and installation.

  1. 01

    First, we listen

    We discuss how you want to live, the space you need, your plot and your budget, then choose a sensible starting design.

  2. 02

    We agree the details

    We confirm the layout, materials, specification, price and schedule. The important details are recorded in the contract.

  3. 03

    We build in controlled conditions

    We assemble the structure, fit insulation and services, and finish the interior. You receive photographs and progress updates throughout production.

  4. 04

    We deliver and install

    We check access and site preparation in advance. After installation, we review the agreed work together and hand over the building and its documentation.

Scope of the offer

What we check for your plot

A good design must also suit its location. Before ordering, check planning requirements, ground conditions, access and utilities, especially if you are still choosing a plot.

Check the specification
01

A price for your chosen design

Starting prices help you plan a budget. The final quote depends on size, specification and the agreed work.

02

Site preparation

Foundations, external connections and access are assessed for the actual location. The quote states who carries out this work.

03

Changes by agreement

Additional materials and work, including their effect on cost and timing, are confirmed before they are carried out.

04

Documented warranty terms

The duration and coverage of obligations are recorded for the agreed building, work and equipment.

Good to know

Frequently asked questions

These answers describe the general process. The exact scope, cost and schedule are agreed after discussing your needs.

Yes. A catalogue model is a starting point. We agree the layout, windows, finishes and services around the way you will use the building and the conditions on your plot before confirming your quote.

The next step

Let’s talk about your project

Tell us what you have in mind and where your plot is. We’ll talk through the options, specification and likely cost together.

Send the message yourself from your email app.